File Name |
File Size |
Download PDF |
|
Cir No.68 Electricity (Amendment) Rules 2024-Notified by the Ministry of Power Regarding..pdf | 487.43 KB | Download Pdf |
Cir No.67 Solar Power Generators (SPGs)-Court ordered to refund the Security Deposit paid for setting up the SPG.pdf | 264.59 KB | Download Pdf |
Cir No.66 TANGEDCO’s instruction issued updating the PAN with Aadhar-Regarding.pdf | 268.22 KB | Download Pdf |
Cir No.64 TECA’s Technical Committee Meeting on 06.01.2024.pdf | 275.29 KB | Download Pdf |
Cir No.63 TECA Representation to Levy the Maximum Demand charges as per Clause 6(b) of the TN Electricity Supply Code 2004..docx | 19.09 KB | Download Doc |
Cir No.62 MoP Seeking comments on Draft Electricity (Late Payment Surcharge and Related Matters) Amendment Rules 2023-Regarding.pdf | 267.82 KB | Download Pdf |
Cir No.61 Encashment of Unutilised Banked Units during the R&C period -Whether 75% or 100%-.pdf | 280.02 KB | Download Pdf |
Cir No.60 Banked Energy already available with a CGP whether could be allotted for a New Captive User on introducing newly by Utility Change.pdf | 566.78 KB | Download Pdf |